History of Oceanside’s Bandshell

An Iconic Beach Landmark

Oceanside’s oceanfront bandshell and beach stadium are unique to San Diego County. Throughout Southern California there are no other similar beachside facilities like it. The Junior Seau Pier Amphitheater provides a one-of-a-kind venue and it has become an integral part of the City’s recreational and cultural amenities.

Just over 100 years ago, plans for a “band stand” on the beach south of the pier were presented to the City Council.  The band stand would “be covered over and a regulation shell formed at the back, ceiled with matched lumber so as to constitute a sounding board or a reflector as an aid when the stand is used for music or public speaking.” Local building contractor Frederick W. Rieke was awarded the contract to build a 24×26 structure in a “Mission style” with cupula and the structure was completed in the Summer of 1919.

Oceanside’s first beach bandshell built in 1919.

After its completion, it quickly became the focal point for activity and was used for concerts and events. (The beach band stand would later became known and referred to as a bandshell, due to its shape.)

On July 4, 1927, Oceanside celebrated its 4th pier. The three day celebration brought thousands of people, triple that of the City’s population. Several improvements were added to enhance the area surrounding the pier: The Strand was paved from Wisconsin to Ninth Street (Neptune Way); a dancing pavilion placed under the pier approach and other amenities including a small cafe built just south of the pier.

To modernize the look of the bandshell, (which was just 8 years old) the cupula was removed. The June 16, 1927  Oceanside Blade newspaper reported:  The remodeling of the band stand with the enlarging of the front platform and the cutting off of a portion of the high top to remove some of the Queen Anne effect and modernize it is being done this week.  

The bandshell was resituated at an angle facing a northeast position. Rows of wooden benches were built to accommodate those attending beach concerts or other festivities held at the bandshell, just below the bluff at Pacific Street. While convenient and necessary, the benches were not enough to seat the hundreds of spectators events would attract and many were left to stand.

Seating on the bluff, before the stadium seating was put in in 1937. Note bandshell placed at an angle. Circa 1930

In 1936, as part of a Works Project Administration (WPA) project, the inadequate seating on the bluff was replaced a beach stadium. The Oceanside News newspaper reported:  Preliminary work was started Monday on a new city project under WPA auspices, the stadium to be constructed on the face of the bank to the south of the pier and overlooking the broad recreation space and band shell. A crew of 14 men now is engaged in clearing off grass and other growth in readiness for construction of a rubble wall, the first stage of the cement stand. Fragments of old concrete will be used in this phase of the building. J.C. Rouse and C.O. Rowe are in charge of the new project, the former for the WPA and the latter for the city.  Both officiated in similar capacities on the new water line and building works. The stadium will provide seating for around 800 persons and greatly improve the facilities and appearance of the section adjoining the pier. The government has allocated $5200 with which to pay the cost of labor and also as a share of the cost of the constructed materials.

In June of 1937 the Oceanside newspaper reported that the stadium seating would accommodate around 2,000 persons.  However, the following day that San Diego Union estimated that nearly 3,000 persons jammed the stadium when it was formally dedicated as part of the Southern California Beauty Contest.

Newly completed stadium seating, 1937

After nearly two decades of service, Oceanside’s first bandshell was dismantled in 1948 due to termite infestation.  For two years a temporary stage was built to accommodate the annual Beach Opening and beauty contests.

While beauty contests were held at the bandshell in the 1920s, the Miss Southern California Beauty Contest officially began in 1931. It grew in popularity each year and drew thousands of people all over San Diego County and contestants from all of Southern California.  Initially the female contestants were sponsored by local merchants.  By the 1940s the contest became very popular with starlets looking to be discovered by movie studios.  

In 1947 the Oceanside Chamber of Commerce announced that movie scouts from three major motion picture studios would be in the audience. “Girls parading across the flower decked ramp will be judged not only on their beauty, but for poise and personality, by the movie star makers.  The girls selected as possible movie material will not necessarily be contest winners, and it is understood that the judges’ decisions will have no bearing on selections made for screen tests.”

According to Lil Jackson, who was a freelance writer for the local paper, this was actually a “planted” story.  Her husband, Louis Jackson, was chairman of the Beauty Contest for the Chamber of Commerce and was having difficulty in getting “quality girls” to enter the contest and getting them sponsored by merchants.  Lil came up with the idea to write the column indicating that Hollywood movie scouts would be at the event in the hopes to draw more girls and sponsors.  One particular year the ploy worked even better than hoped.  It just so happened that a movie starring John Wayne was being filmed at Camp Pendleton, “Sands of Iwo Jima”.  Many of the cast were staying at the Carlsbad Hotel and agreed to be judges and made this competition one of Oceanside’s most successful and publicized beauty contests.

In 1956, a star was born – or at least made her debut on the Oceanside’s beach stage. Raquel Tejada was the second of three finalists of the famed beauty contest. She would go on to win the title of Miss Fairest of the Fair at the San Diego County Fair.  Later she changed her name and became an actress and 1960s sex symbol Raquel Welch.

After two years without a proper event venue, in April of 1950 bids were opened for the construction of a new beach bandshell. City planners recommended that the bandshell be “relocated directly in front of the beach bleachers and adjoining the Strand.” Plans were drawn by prominent San Diego architect Sam W. Hamill, who also designed several Oceanside schools buildings.  Original plans were to include “a Mission flavor, carried out by tile roof and stucco exterior.” However, the April bids were considered too high and Hamill was asked to revise his plans, eliminating the tile roofing. 

The local newspaper described Hamill’s design: The shell is to be 58 feet wide and 19 feet deep on the outside, with the concrete stage extending an additional seven feet beyond the face of the overhead structure.  There will be steps in front of the stage on both sides, leading up to the platform, and doors to both the back and wings of the stage. Dressing rooms for men and women, complete sanitary facilities, will be included in the backstage portion of the shell, facilitating theater productions, and provisions will be made for the possible installation of curtains along the front of the stage.  Storage room backstage will accommodate stage furnishings, props and other equipment for various types of spectacles.

Richardson Brothers constructed the bandshell which was completed in June 1950 for the annual Oceanside Beach Celebration.  Saunders Construction Company laid the large 14,000 square concrete slab to be used particularly for square dancing which was popular at the time. The concrete “mat” as it was referred to, was also used for roller skating, volley ball games and shuffleboard.

Crowds gather at the Miss Southern California Beauty Contest in 1955

In 1953 the band shell and “bleachers” received renovations.  The inside of the bandshell was painted a light blue, while the backs of the bleacher seats and fencing behind it, a light green. It was common to decorate the bandshell with gladiolas and palm fronds for beauty contests and beach opening celebrations.

In 1960 the Oceanside High School began having graduation ceremonies at the bandstand or beach amphitheater to accommodate families and guests.  Although it can no longer adequately accommodate the number of graduates and their many guests, students have long insisted on holding their graduation ceremony at the bandshell because of the longstanding tradition.

During the Vietnam War the bandshell and stadium were used for demonstrations. Black Panther Angela Davis was a speaker at one such protest, drawing thousands.

Vietnam War Protests at the Oceanside Bandshell, 1970

In the 1980s concerts were revived and the bandshell hosted notable entertainers including jazz legend Lionel Hampton and Oceanside’s own Barbara Mandrell.  To accommodate such events, risers and wooden platforms were used to hold or provide space for needed equipment such as lighting, speakers and cameras. 

In 1991 the bandshell stage was temporarily enlarged to accommodate a military event: “Welcome Home the Troops” parade and celebration.  Many servicemen and women were returning from the Middle East having been deployed for Operation Desert Storm.  The Fieldstone Corporation along with Orco Block Company and U.S. Silica donated materials for the extension. The stage was extended 12 feet out and 70 feet across. 

Oceanside’s iconic bandshell was featured in a movie “Bring It On” filmed in 2000 starring Kierstin Dunst and Gabrielle Union, and can also be spotted in episodes of the current television show “Animal Kingdom”.

On May 16, 2012, the Oceanside City Council voted to rename the Oceanside Pier Amphitheater, as well as the beach community center, in honor of Junior Seau. A native of Oceanside, Seau graduated from Oceanside High School and went on to play professional football in the NFL for the San Diego Chargers and was a beloved local citizen.

The Oceanside bandshell is an historic and cherished landmark, still in use for a variety of community events including cultural celebrations, religious services, outdoor movies and concerts.

Oceanside Pier Amphitheater during Armed Forces Day Operation Appreciation 2016

History of Oceanside’s First Pier

Oceanside’s Pier is iconic, a favorite landmark and one of its most photographed and visited features. Untold thousands enjoy Oceanside’s pier every year.  Fishermen, tourists and locals stroll along the wooden planking and gaze into the ocean, just as Oceanside’s early citizens did over 130 years ago. Oceanside’s pier is a tradition, one that despite relentless waves, high tides, low funds managed to survive.

Remnants of our first pier are now buried. An occasional storm or low tide uncovers the rows of the old, weathered pilings (or what’s left of them). In fact, they just made an appearance in 2020. Few people know they are there or realize their significance.

Pilings from the first pier at the end of Wisconsin Street in 2012

The first pier, called a wharf, was located at the end of what is now called Wisconsin Street, first named Couts Street (after Cave J. Couts, Jr., surveyor of the original townsite).

Talk of a wharf began in 1887 when soundings were made. This was no “pleasure pier” for sightseers but intended to be a shipping port with a price tag of $30,000. The National City Record reported that the wharf would be 1,596 feet long, 50 feet wide and would accommodate “vessels drawing 25 feet of water.” If that wasn’t impressive enough, it went on to say that the wharf would be connected to the railroad! A color lithograph done in 1887 depicts the railroad spur leading to the pier “with a turn-around track for cars” and a large ship docked at the wharf.

Portion of 1887 Lithograph depicting the railroad spur on the wharf (which never came to be). Photo from the Oceanside Historical Society Collection

On March 9th the South Oceanside Diamond reported: “Our citizens are determined to have a wharf. The plans have been drawn, money subscribed and it ought to be completed by July 4th.”

A year later, plans were drawn up for a more modest structure, without the railroad spur. The San Diego Union published the following: “A contract has been closed by the Oceanside Wharf Company, of Oceanside, for the building of a pier wharf at that place. It will be 1505 feet in length, will command a depth of 31 feet and the piles will be covered with parafine paint and felt, and will be braced by iron sway bracing. The estimated cost of the structure is $35,000, and it is contracted to be completed in four months.”

Everyone was overly optimistic but the first piling wasn’t even driven into the sand until May 12, 1888. The new date for completion was extended to September.

Oceanside was a boomtown then – real estate speculators came in and bought large lots with the hope of becoming rich. Men with big ideas and great plans for the city poured in. Some left as quickly as they came, while many stayed and made decisions and impressions that are with us today.

One of these men, Col. Daniel H. Horne, Oceanside’s first president of the Board of Trustees, along with banker Charles Morrill, proposed enterprising, if rather lofty ideas. They made rousing speeches of the future of Oceanside. They talked of the train, a Flume Company and the building of a wharf.  Real estate agent J. Chauncey Hayes advertised one would be “wearing diamonds” if they invested in the local real estate. Men like Hayes, Horne and Morrill supported the wharf and even backed it financially. Supporters of the wharf claimed that Oceanside would rival San Diego, Los Angeles and San Francisco with the help of a wharf. Citizens rallied, eager to help. They pledged labor and money for the wharf project that would bring them wealth and prosperity.

The wharf fund was raised by subscription. $28,000 was pledged by Oceanside residents and businessmen. The amounts ranged from $10 to $5,000. One year later, however, less than half of these pledges were paid and citizens were urged to “step up” and pay their subscriptions.

The lumber for the wharf came by railroad but also by boat. It was floated to the shore and guided by skiffs. But it was not without trouble. On June 29, 1888 the South Oceanside Diamond reported: “The sea has been unusually high the past week and the Starbuck has been unable to land any lumber. On Wednesday the water ran so high that not even a boat could cross the breakers, and the Starbuck’s crew stayed beyond them. Bob Simpson, the champion swimmer, carried a message to the boat through the surging sea.”

Delivering the lumber was a slow process. Two weeks later the Starbuck was still delivering wharf materials through the surf “slowly but surely”. By June 20, 1888 work finally began but a new completion date of December 1st was announced.

The building contract was given to the Great American Bridge Company of San Francisco and its superintendent was J.P. Sheldon.  By August 3rd the wharf was out 500 feet and fishing from it became the favorite pastime for residents.

The Diamond reported that another ship, the Olive S. Southard, had “unloaded 15,000 feet of lumber and 258 piles, which completes the amount of lumber required for the wharf.” Soon the wharf was stretching out at 1,000 feet.

Surely shipping vessels would be docking soon, people thought. With a wharf the costs of goods such as badly needed lumber would be reduced. Oceanside would become an important shipping port between Los Angeles and San Diego. Fifteen trains a day pulled into our train depot – count would soon begin of the steamers arriving at the wharf.

By the end of August the wharf was out 1,340 feet. However, the wharf company ran out of “silver-coppered nails” and work was been suspended for 60 days. In October the wharf sat unfinished, out of nails and out of money. The South Oceanside Diamond printed the following poem:

The Wail of the Wharf

Alone I am left, half clad in the cold; My long feeble legs are bare to the wave.

The reason is, I suppose, no shares have been sold. And slowly I’ll find me a watery grave.

I haven’t the piles, as some people think, nor is it the climate that’s breaking me up;

My lungs are first rate but the needful chink those doubting shareholders will not put up

Another setback occurred in December of 1888 when a storm swept pilings and planks from the Oceanside pier and lumber was washed down to Carlsbad.  Few people know that Carlsbad also had the makings of a small wharf, but the storm did greater damage to the Carlsbad wharf and it was completely destroyed. Unsympathetic, Oceanside citizens went to the beach and gathered the lumber from the Carlsbad wharf and used it for firewood!

Still determined, despite damage to its own wharf, Oceanside rallied and residents pledged 260 days of labor and donated a modest amount of money to finish the project. W. D. Frazee offered to begin work on the wharf each morning with much needed prayer.

The completion deadline came and went. Wharf lumber was being used as a boardwalk to the South Pacific Hotel from the train tracks rather than for decking. “When will the wharf be completed?” was a question echoed in the columns of the newspaper and on the streets of Oceanside.

The February 1, 1889 edition of the South Oceanside Diamond ran a sketch of the wharf as it would appear by the new deadline: September, 1890! But bit by bit, the wharf was being whittled away by heavy seas. The portion remaining intact was said to “answer one purpose admirably–that of a barnacle roost.”

Sketch of the proposed Oceanside Pier from the South Oceanside Diamond newspaper

Optimism, although dim, remained. In April of 1889 the wharf was scheduled for repairs and was going to be braced and the talk of steamers began once again. In August Oceanside asked its citizens to raise an additional $4,000 and promised the wharf would be completed within 40 days when work commenced.

Only known photo of Oceanside’s first pier taken July 4, 1890. You can barely see it in the distance. Photo from the Oceanside Historical Society collection, courtesy Randy Carpenter.

Records are missing and it is unclear as to if Oceanside’s wharf was ever completed but winter storms had reduced the wharf to 940 feet.  On December 30, 1890 the final blow was dealt when the furious storms finished what was left and swept away all but 300 feet of the wharf. Newspapers from Los Angeles to San Diego reported its demise.

Oceanside’s first pier was gone but the dream was not forgotten. The wharf had become a fixture for the tiny town. If shipping vessels couldn’t dock, the wharf served another purpose, a fishing and pleasure pier.

Talk began immediately of building an iron wharf. It would take four years, but eventually Oceanside’ second pier was built at the end of Third Street (Pier View Way) in 1894. 

Oceanside’s 2nd pier, under construction in 1894. Photo from the Oceanside Historical Society collection.

Over the years we have had six piers, with our present pier being dedicated in September, 1987. We are proud of our beautiful pier. We are equally proud of the citizens who have persevered and have dared to dream. Oceanside has always loved its pier and it would not be the same without it.

The next time you walk the Strand, stand at the end of Wisconsin Street and look. During a low tide you might just catch a glimpse of those pilings. The pilings are placed 29 feet apart, (which would have provided a rather narrow decking) and a row of center pilings helped to brace it. Ten pilings were visible on June 7, 2012 at a minus 1.2 tide. They appeared again a year or so later. On June 25, 2020, the low tide exposed the pilings again.

Those worn down nubs of wood are all that is left of Oceanside’s first pier, but they represent the ambition and undying vision of Oceanside.

Close up of pier piling in 2012